Project Overview

We performed the role of Design consultant to the client in performing analysis of complete power system of KFIA Dammam and design the most optimum solution which will cover 100% standby Generation capacity for the entire airport system.Data Acquisition & Site Survey ETAP Studies Design drawings of Electrical System as per studies Complete design of buildings needed to accommodate new electrical equipment of centralized generator including Civil, MEP and site development around the buildings. Design of utilities such as power, water, sewage from tie in points near the building. Design of local Generator Building. Design of fire protection system of new buildings

Project Metrics

sqft

TR

M SAR

Completion Certificate