HVAC system design – Advanced Pharmaceutical Factory

Project Overview

Performed the role of technical and design consultant to perform the following:- BIM modeling for the entire HVAC related Ducting in multiple buildings such as Admin Building o Production Building o Utility Building o Warehouse Building Equipment schedule for the VAV, Duct heater/Sound Attenuator. Preparation of flow diagram, Bulk BOQ, and Shop drawings for ducting based on the HVAC design

Project Metrics

sqft

TR

M SAR

Completion Certificate

Official project approval documentation

Saudi Health Ministry

Ready to Start Your Project?

Let’s discuss how our engineering expertise can bring your vision to life.