King Abdul Aziz Center for World Culture (KAACWC), SAUDI ARAMCO – Commissioning of DPCVs and Study of the Smoke Exhaust system

Project Overview

Review of the overall chilled water piping system with particular attention to the evaluation of the requirement of the DPCVs including benefits of the DPCVs and general requirements for the commissioning of the DPCVs. Our scope of work also included the study of the smoke exhaust system and identifying any bottlenecks which is obstructing the air flow and recommend any modification of the existing duct system that may benefit the enhancement of the flow rate to satisfy the requirement. Engineering Design scope for the replacement of 218 number of FCUs HVAC Design upgradation for Auditorium 1. Site investigations 2. Evaluation of the existing HVAC system 3. Preparation of revised heat load calculations and identify the required air flowrate Demolition / Modification Drawing, as required 4. Evaluation of the existing chilled water flow requirements and providing solutions for the enhancement of the HVAC system. 5. Preparation of construction package as pe Saudi Aramco standards and procedures

Project Metrics

sqft

TR

M SAR

Completion Certificate

Official project approval documentation

Saudi Health Ministry

Ready to Start Your Project?

Let’s discuss how our engineering expertise can bring your vision to life.