Sulphate Removal, Aindar, Aramco Project

Project Overview

We performed the role of Design consultant to the contractor for HVAC detailed design and shop drawings.Site survey and study of the 110/208 voltage power supply system Replacing the existing transformer with a suitable standard secondary voltage Replacing the Downstream power panels, Lighting system, power outlets, etc., in compliance with the Standard Voltage system Replacing all the obsolete voltage equipment with the equivalent standard voltage equipment.

Project Metrics

sqft

TR

M SAR

Completion Certificate

Official project approval documentation

Saudi Health Ministry

Ready to Start Your Project?

Let’s discuss how our engineering expertise can bring your vision to life.